Installation and Acceptance Standards: The final safety checkpoint before park opening
1. Assembly Acceptance: All slide flange bolts are evenly tightened, with no gaps or steps on the inner wall of the joints, and no jamming during water testing;
2. Load Test: Full-load counterweight test to check structural deformation; steel frame shows no swaying, and welds show no cracks;
3. Water Supply Test: Lubricating water flow is uniform in each slide; insufficient water flow will significantly increase friction, easily causing jamming and abrasions to visitors;
4. Safety Signage: Height and weight restriction warning signs, anti-slip steps, and guardrail height meet standards; additional protection is provided in children's areas.
![]()
![]()
Company: Guangzhou Milan Amusement Technology Co.,LTD
Website: milanamusement.com
Contact us: Ms Aimee
WhatsApp/Wechat: +86-19875114360
Email: milanamusement@163.com
Address: No.28,Lanxing Street,Gaosha Road,Dagang Town,Nansha District,Guangzhou